[vc_row][vc_column][vc_empty_space][/vc_column][/vc_row][vc_row css=”.vc_custom_1703690328020{background-color: rgba(140,150,157,0.2) !important;*background-color: rgb(140,150,157) !important;}” conditional_render=”%5B%7B%22value_role%22%3A%22administrator%22%7D%5D”][vc_column width=”1/3″][vc_empty_space][vc_column_text]
KOWOPRO K
[/vc_column_text][vc_column_text css=””]Article No.: 12 305XX
Manual Film Processing Units
Simple, manual
Developing of NDT X-ray films[/vc_column_text][/vc_column][vc_column width=”1/3″][/vc_column][vc_column width=”1/3″][vc_empty_space][vc_gallery interval=”3″ images=”1518,1524,1525″ img_size=”442×319″ onclick=”img_link_large” custom_links_target=”_blank”][/vc_column][/vc_row][vc_row][vc_column][vc_empty_space][vc_accordion active_tab=”1″ collapsible=”yes” type=”custom” skin=”light”][vc_accordion_tab title=”Description” show_icon=”yes” icon=”fas fa-angle-down”][vc_row_inner][vc_column_inner][vc_column_text css=””]
KOWOPRO K series Manual Film Processing Units for X-ray films
These processing units are designed for simple, manual developing of NDT X-ray films.
Complete unit is made of durable, grey PVC material and has four separate tanks.
Three smaller tanks on the left for Developer,
Rinse and Fixer are placed in the Heating Water Tank by which these tanks can be heated of cooled. The large tank on the right is for Final Wash
of fixed films or additionally for cleaning of channel hanger and
equipment after developing process.
All tanks can be closed with a cover even when channel hangers are hung in and
tanks for Developer and Fixer can be taken out of the unit for cleaning or exchange.
Water Tanks and the Heating Water Tank, all equipped with a spillway,
are filled and rinsed thru three separate taps. With the tap for Heating Water Tank the intake of cold water,
for cooling Developer and Fixer
For operation of the unit connections for electrical power, water and drain have to be provided.
can be controlled. The micro-processor controls temperature and monitors Min-level in Heating Water Tankand also can be used as darkroom timer (Count-Down-Timer).
For operation of the unit connections for electrical power, water and drain have to be provided.[/vc_column_text][/vc_column_inner][/vc_row_inner][/vc_accordion_tab][vc_accordion_tab title=”Specification” show_icon=”yes” icon=”fas fa-angle-down”][vc_row_inner][vc_column_inner width=”1/2″][vc_column_text css=””]Housing
Water Taps
Darkroom Timer
Temperature
Heating Power
Connection Electrical Power
Connection Water
Connection Drain[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/2″][vc_column_text css=””]PVC, grey, 7 mm thick
Heating Water Tank, Rinse – and Final Water Tank
0 … 60 min ((preset to 5 min)
15°C … 25°C, controllable (preset to 20°C)
1.000 W – (K41- 2.000 W)
220 … 240 V / 50 … 60 Hz / 10 A, 3 m long
G3/4 in, 2 m long
Ø 1 in / Ø 25/31 mm, 2 m long[/vc_column_text][/vc_column_inner][/vc_row_inner][/vc_accordion_tab][vc_accordion_tab title=”Types” show_icon=”yes” icon=”fas fa-angle-down”][vc_row_inner][vc_column_inner width=”2/3″][vc_column_text css=””]Types:[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/3″][vc_column_text css=””]Article No.:[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”2/3″][vc_column_text]KOWOPRO K21[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/3″][vc_column_text]12 30530[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner][vc_column_text css=””]
Tank for Developer, Fixer – removeable | 25 l | 12x41x57 cm – (fill level 53 cm) |
Rinse Water Tank – fix | 25 l | 12x41x57 cm – (fill level 53 cm) |
Final Water Tank – fix | 75 l | 27,3x48x67 cm – (fill level 59 cm) |
Dimensions (W x D x H) | 85 x 71 x 93 cm | |
Weight – empty (filled) | 50 (ca. 200) kg |
[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”2/3″][vc_column_text]KOWOPRO K31[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/3″][vc_column_text]12 30540[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner][vc_column_text css=””]
Tank for Developer, Fixer – removeable | 25 l | 12x41x57 cm – (fill level 53 cm) |
Rinse Water Tank – fix | 25 l | 12x41x57 cm – (fill level 53 cm) |
Final Water Tank – fix | 110 l | 39,3x48x67 cm – (fill level 59 cm) |
Dimensions (W x D x H) | 97 x 71 x 93 cm | |
Weight – empty (filled) | 55 (ca. 240) kg |
[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner width=”2/3″][vc_column_text]KOWOPRO K31[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/3″][vc_column_text]12 30550[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner][vc_column_inner][vc_column_text css=””]
Tank for Developer, Fixer – removeable | 55 l | 25x41x57 cm – (fill level 53 cm) |
Rinse Water Tank – fix | 55 l | 25x41x57 cm – (fill level 53 cm) |
Final Water Tank – fix | 150 l | 52x48x67 cm – (fill level 59 cm) |
Dimensions (W x D x H) | 148 x 71 x 93 cm | |
Weight – empty (filled) | 70 (ca. 320) kg |
[/vc_column_text][/vc_column_inner][/vc_row_inner][/vc_accordion_tab][vc_accordion_tab title=”Accessories” show_icon=”yes” icon=”fas fa-angle-down”][vc_row_inner][vc_column_inner][vc_column_text css=””]You can find accessories on the leaflet[/vc_column_text][/vc_column_inner][/vc_row_inner][/vc_accordion_tab][vc_accordion_tab title=”Leaflets” show_icon=”yes” icon=”fas fa-angle-down”][vc_row_inner][vc_column_inner][vc_column_text css=””]leaflet German: KOWOPRO K
leaflet English: KOWOPRO K[/vc_column_text][/vc_column_inner][/vc_row_inner][/vc_accordion_tab][/vc_accordion][vc_empty_space][/vc_column][/vc_row]